Research Article
Optimization of High-Speed Railway Line Planning Considering Extra-Long Distance Transportation
Table 5
Partial solution results of decision variables
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Note: The routes in the table represent only running paths, including information passing through nodes and arcs, but not stop information.The same OD pairs are marked in bold. The passenger flow of OD pair in bold in the second column is transported by multiple lines in the third column. |