Research Article
Railway Safety Risk Assessment and Control Optimization Method Based on FTA-FPN: A Case Study of Chinese High-Speed Railway Station
Table 6
Costs of Control Methods for Risk factors and Predicted Risk Levels after Control.
| Risk source | Salary (10,000 Yuan/year) | Material (10,000 Yuan/year) | Other cost (10,000 Yuan/year) | Total cost (10,000 Yuan/year) | |
| P14, P10 | | | 5 | 5 | 0.309 | P5 | | 5 | 15 | 20 | 0.309 | P6 | | | 5 | 5 | 0.373 | P2 | 10 | 5 | | 15 | 0.373 | P3 | 15 | | 5 | 20 | 0.436 | P4 | 10 | | 5 | 15 | 0.373 | P1 | 15 | | 5 | 20 | 0.436 | P8 | 10 | 10 | | 20 | 0.309 | P11 | 10 | 5 | | 15 | 0.206 | P13 | 20 | | 10 | 30 | 0.206 | P12 | 10 | 5 | | 15 | 0.206 |
|
|