Research Article

Railway Safety Risk Assessment and Control Optimization Method Based on FTA-FPN: A Case Study of Chinese High-Speed Railway Station

Table 6

Costs of Control Methods for Risk factors and Predicted Risk Levels after Control.

Risk sourceSalary (10,000 Yuan/year)Material (10,000 Yuan/year)Other cost (10,000 Yuan/year)Total cost (10,000 Yuan/year)

P14, P10550.309
P5515200.309
P6550.373
P2105150.373
P3155200.436
P4105150.373
P1155200.436
P81010200.309
P11105150.206
P132010300.206
P12105150.206