Research Article

Shunting Strategy for Placing-In and Taking-Out Wagons on Branch-Shaped Freight Operation Network with Simulation Method

Table 1

List of all Arena modules used in the simulation model.

ModuleNameModuleName

CreateWagon group iPickstationChoose the first placing-in operation site
AssignDestination is operation site iPickstationTravel to next placing-in operation site
AssignStart time iPickstationTravel to first taking-out operation site
AssignCompletion time iPickstationTravel to next taking-out operation site
AssignCompletion helper iPickstationTravel to the first shift-out operation site
AssignTaking-out time iPickstationTravel to next shift-out operation site
AssignTaking-out helper iDecideFinish placing-in wagons
AssignShift-out time iDecideWait
StationSpan shift-moving helper iDecideFinish taking-out wagons
StationOperation site iDecideLast placing-in operation site
StationShift-out operation siteDecideSpan-shift-moving shunting operation is finished
StationShift-into operation sitePickupPickup wagon group
StationShunting yardPickupPickup double operation wagons
RequestCall the locomotiveRouteReturn to shunting yard
RequestLocomotiveRouteTravel to corresponding shift-into operation site
BatchAccumulate local wagonsReadWriteOutput start time i
SeparateDetach all local wagonsReadWriteOutput completion time i
DisposeDeparture yardReadWriteOutput taking-out time i
Search and removeSelect specific wagon groupReadWriteOutput shift-out time i
ProcessOperationHoldHold wagon group in current operation site