Research Article

Shunting Strategy for Placing-In and Taking-Out Wagons on Branch-Shaped Freight Operation Network with Simulation Method

Table 6

Performance for different shunting strategies on PTWS under SSM-ECT.

SiteMeasureATT-ECTADT-ECTRTT-ECTRDT-ECTATT-NL&CTADT-NL&CTRTT-NL&CTRDT-NL&CT

1WT18.6676.0007.8004.9338.6676.0677.8004.000
DT19.6677.0008.8005.9339.6677.0678.8005.000

2WT22.5673.0342.3000.6342.5673.0342.3000.634
DT24.6674.5343.8002.1344.6674.5343.8002.134

3WT35.0665.5335.0674.8003.8005.6003.8003.867
DT310.06610.53310.0679.8008.80010.6008.8008.867

4WT43.8672.8002.8002.2003.8672.8002.8002.200
DT45.8674.8004.8004.2005.8674.8004.8004.200

5WT55.7346.0665.7335.3335.8007.6005.8005.866
DT58.7349.0668.7338.3338.80010.6008.8008.866

6WT65.5665.9005.5675.1676.3008.1006.3006.367
DT68.0668.4008.0677.6678.80010.6008.8008.867

7WT72.8661.1342.8673.0002.8661.1342.8673.000
DT73.8662.1343.8674.0003.8662.1343.8674.000

8WT83.3005.1003.3004.9671.3002.6341.3001.234
DT810.80012.60010.80012.4678.80010.1348.8008.734

9WT94.9662.9664.9674.6336.5332.9666.0335.033
DT96.4664.4666.4676.1337.5334.4667.5336.533

10WT103.4673.83.4674.2674.1673.8003.6672.667
DT105.4675.85.4676.2675.6675.8005.6674.667

11WT113.85.3343.84.6002.6333.2002.1343.467
DT114.86.3344.85.6003.1334.2003.1344.467

TWT49.86647.66747.66844.53448.546.93544.80138.335
TDT78.46675.66775.66872.53475.674.93572.80166.335
TTT15.114.73314.73317.03313.16614.73312.83313.966

Note. The freight operation site is shift-out site; the freight operation site is shift-into site.