Research Article

Integrated Optimization on Energy Saving and Quality of Service of Urban Rail Transit System

Table 10

Comparison of energy saving and quality of service between the current timetable and optimized timetables.

Current timetableOptimized timetables
OESTOQOST

DirectionUpDownUpDownUpDown
Overlapping time/s492.05502.711380.081401.141114.881140.36
Available regenerative braking energy/(kWh)53.9552.78161.72157.95128.24126.26
Average regenerative braking utilization ratio0.180.190.460.490.380.40
Total energy consumption/(kWh)2441.532228.552292.81
The deviation of trains running time in one circle/s07280