Research Article

Integrated Optimization on Energy Saving and Quality of Service of Urban Rail Transit System

Table 8

The optimized running time of three phases in each section.

Up directionAccelerating time/sCoasting time/sBraking time/sDown directionAccelerating time/sCoasting time/sBraking time/s

M1-M216.43161.0616.51M13-M1216.2465.0918.67
M2-M315.6568.5017.85M12-M1118.15102.7320.12
M3-M418.91113.2820.81M11-M1018.46111.2420.30
M4-M518.6092.4720.93M10-M917.51125.7418.75
M5-M615.2351.0117.76M9-M816.5867.3819.04
M6-M717.1975.2019.61M8-M715.9366.8318.24
M7-M816.3863.7418.88M7-M617.4073.6919.91
M8-M916.8065.8419.36M6-M513.8160.4315.76
M9-M1018.00120.5119.49M5-M418.0896.7420.18
M10-M1119.06105.7621.18M4-M318.36118.6619.98
M11-M1218.8097.1321.07M3-M215.0772.9217.01
M12-M1316.4763.5319.00M2-M116.35162.2716.38