Research Article
Integrated Optimization on Energy Saving and Quality of Service of Urban Rail Transit System
Table 8
The optimized running time of three phases in each section.
| Up direction | Accelerating time/s | Coasting time/s | Braking time/s | Down direction | Accelerating time/s | Coasting time/s | Braking time/s |
| M1-M2 | 16.43 | 161.06 | 16.51 | M13-M12 | 16.24 | 65.09 | 18.67 | M2-M3 | 15.65 | 68.50 | 17.85 | M12-M11 | 18.15 | 102.73 | 20.12 | M3-M4 | 18.91 | 113.28 | 20.81 | M11-M10 | 18.46 | 111.24 | 20.30 | M4-M5 | 18.60 | 92.47 | 20.93 | M10-M9 | 17.51 | 125.74 | 18.75 | M5-M6 | 15.23 | 51.01 | 17.76 | M9-M8 | 16.58 | 67.38 | 19.04 | M6-M7 | 17.19 | 75.20 | 19.61 | M8-M7 | 15.93 | 66.83 | 18.24 | M7-M8 | 16.38 | 63.74 | 18.88 | M7-M6 | 17.40 | 73.69 | 19.91 | M8-M9 | 16.80 | 65.84 | 19.36 | M6-M5 | 13.81 | 60.43 | 15.76 | M9-M10 | 18.00 | 120.51 | 19.49 | M5-M4 | 18.08 | 96.74 | 20.18 | M10-M11 | 19.06 | 105.76 | 21.18 | M4-M3 | 18.36 | 118.66 | 19.98 | M11-M12 | 18.80 | 97.13 | 21.07 | M3-M2 | 15.07 | 72.92 | 17.01 | M12-M13 | 16.47 | 63.53 | 19.00 | M2-M1 | 16.35 | 162.27 | 16.38 |
|
|