Research Article

A Cost and Passenger Responsible Optimization Method for the Operation Plan of Additional High-Speed Trains in a Peak Period

Table 7

Optimal solutions and computational times with different weight coefficients.

Computational times (s)

0.01.031956363193535.851
0.10.9893.156063193765.045
0.20.81467.2560631918672.136
0.30.72013.344947593637.107
0.40.62303.4438112993338.284
0.50.52372226221243429.896
0.60.42184.8114333173325.990
0.70.31996.1114333173462.992
0.80.21807.4114333173432.277
0.90.11618.7114333173471.721
1.00.01390113937973552.153