Research Article
A Cost and Passenger Responsible Optimization Method for the Operation Plan of Additional High-Speed Trains in a Peak Period
Table 7
Optimal solutions and computational times with different weight coefficients.
| | | | | | | Computational times (s) |
| 0.0 | 1.0 | 319 | 5 | 636 | 319 | 3535.851 | 0.1 | 0.9 | 893.1 | 5 | 606 | 319 | 3765.045 | 0.2 | 0.8 | 1467.2 | 5 | 606 | 319 | 18672.136 | 0.3 | 0.7 | 2013.3 | 4 | 494 | 759 | 3637.107 | 0.4 | 0.6 | 2303.4 | 4 | 381 | 1299 | 3338.284 | 0.5 | 0.5 | 2372 | 2 | 262 | 2124 | 3429.896 | 0.6 | 0.4 | 2184.8 | 1 | 143 | 3317 | 3325.990 | 0.7 | 0.3 | 1996.1 | 1 | 143 | 3317 | 3462.992 | 0.8 | 0.2 | 1807.4 | 1 | 143 | 3317 | 3432.277 | 0.9 | 0.1 | 1618.7 | 1 | 143 | 3317 | 3471.721 | 1.0 | 0.0 | 1390 | 1 | 139 | 3797 | 3552.153 |
|
|