|
Parameters | Definitions |
|
nc | Number of CTs, and each train can be expressed by i |
ne | Number of existing trains, and each train can be expressed by j |
m | Number of the stations, and each station can be expressed by s |
, | Number of the sleeping train units/seat train units of train i |
, | The seat capacity of one sleeping train unit/seat train unit |
Ro | Average passenger attendance factor of the CTs |
D | The total passenger demand of the CTs |
| The passenger demand of OD-ss′ |
, | The arrival time of train i at station s before/after adjustment |
, | The departure time of train i at station s before/after adjustment |
| The dwell time of train i at station s |
| The maximal travel time of the passengers expected |
| The proportion of the passenger demand in the time period r |
| The price of the sleeping train unit/seat train unit of OD-ss′ |
| The demand of the sleeping train unit/seat train unit of OD-ss′ |
| The operation cost of one train unit per minute |
| The cost coefficient for increasing one train |
| The adjustment cost of the existing trains |
| The travel time of the trains between stations s and s + 1 |
, | The additional time of departure and additional time of arrival |
, | The arrival headway and departure headway at station s |
| The maximum adjustment time of the CTs |
| The minimum dwell time of train i at station s |
| The maximum dwell time of train i at station s |
| The maximum usable capacity of station s besides the existing trains |
| The maximum adjustment time of the existing trains |
| The maximum number of adjusted trains |
|