Research Article

Reliability Optimization Model of Stop-Skipping Bus Operation with Capacity Constraints

Table 2

Statistical analysis of bus running time.

Bus stopRunning time (min)
MeanMinimumMaximumStandard deviation (σ)

1 (Fuqiang street)–20.50.40.90.11
2-31.11.02.10.23
3-41.00.81.50.19
4-51.10.81.60.21
5-61.51.31.90.29
6-71.20.91.60.25
7-83.63.24.50.71
8-91.00.91.30.23
9-102.11.92.90.44
10-111.41.32.00.26
11-121.00.81.50.21
12-132.21.92.80.42
13-143.53.14.40.68
14-151.81.62.20.38
15-162.92.63.50.53
16-173.53.14.80.72
17-182.01.72.70.41
18-193.83.35.20.75
19-20 (Changchun Station)3.52.94.50.69