Research Article

Optimal Operation Scheme with Short-Turn, Express, and Local Services in an Urban Rail Transit Line

Table 4

Scenarios analysis with respect to original demand levels.

Demand with respect to original demand (%)Total cost (RMB)Solution time (s)Transit lines settingService frequency (trains/h)

12091239536201178
11220
11910

806300961681.11128
1128
11910

504211671305.51128
1198