Research Article

Optimal Operation Scheme with Short-Turn, Express, and Local Services in an Urban Rail Transit Line

Table 5

Result comparison of the two schemes.

Scheme typeTotal cost (RMB)Operator cost (RMB)User cost (RMB)Transit lines settingService frequency (trains/h)

High-quality scheme82562942233340329611210
18
18
1 10

Empirical scheme8950784317284633501168
11224
18