Research Article
Takeover Quality: Assessing the Effects of Time Budget and Traffic Density with the Help of a Trajectory-Planning Method
Figure 1
The hexapod simulator during a takeover scenario. The participant has regained manual control and made a lane change to the left lane. Roadworks can be seen behind the wall in the right lane.