Research Article
Production Scheduling considering Outsourcing Options and Carrier Costs
Table 4
Average objective values for instances with
and different
βs.
| | β | OPT | H1 | H2 | H3 |
| | 1.3 | −68.956 | −5.967 | −63.696 | −67.716 | | 1.5 | −68.104 | −5.967 | −63.175 | −66.471 | | 1.7 | −65.744 | −5.967 | −62.949 | −64.591 | | 2.0 | −67.133 | −5.967 | −62.800 | −63.433 |
|
|