Research Article
Mathematical Optimization Model for Truck Scheduling in a Distribution Center with a Mixed Service-Mode Dock Area
Table 4
Obtained results for the future scenario of ice cream in C shift.
| ā | Number of platforms | Makespan (min) | Lower bound (min) | Gap (%) | CPU time (sec) |
| CPLEX | 1 | 737.00 | 442.57 | 39.95 | 9000.00 | 2 | 363.90 | 249.10 | 31.55 | 9000.00 | 3 | 263.90 | 245.10 | 7.12 | 9000.00 | 4 | 245.10 | 245.10 | 0.00 | 1.26 | 5 | 245.10 | 245.10 | 0.00 | 1.74 | 6 | 245.10 | 245.10 | 0.00 | 1.69 | 7 | 245.10 | 245.10 | 0.00 | 1.86 | 9 | 245.10 | 245.10 | 0.00 | 3.16 | 12 | 245.10 | 245.10 | 0.00 | 3.03 | 15 | 245.10 | 245.10 | 0.00 | 4.56 | 18 | 245.10 | 245.10 | 0.00 | 5.1 | 19 | 245.10 | 245.10 | 0.00 | 5.7 | 21 | 245.10 | 245.10 | 0.00 | 11.29 |
| Gurobi | 1 | 737.00 | 515.40 | 30.07 | 9000.00 | 2 | 363.90 | 245.10 | 32.65 | 9000.00 | 3 | 264.30 | 245.10 | 7.26 | 9000.00 | 4 | 245.10 | 245.10 | 0.00 | 1.74 | 5 | 245.10 | 245.10 | 0.00 | 3.25 | 6 | 245.10 | 245.10 | 0.00 | 1.03 | 7 | 245.10 | 245.10 | 0.00 | 2.13 | 9 | 245.10 | 245.10 | 0.00 | 3.35 | 12 | 245.10 | 245.10 | 0.00 | 4.78 | 15 | 245.10 | 245.10 | 0.00 | 5.37 | 18 | 245.10 | 245.10 | 0.00 | 5.13 | 19 | 245.10 | 245.10 | 0.00 | 10.4 | 21 | 245.10 | 245.10 | 0.00 | 8.01 |
|
|
Source: owner.
|