Research Article

Collaborative Control Optimization on Reversible Lanes in Intersection Group under Intelligent Vehicle Infrastructure Cooperative System

Table 1

Signal phase sequence before optimization.

Intersection parameterSignal phase sequenceSignal period

Intersection of Tongyang Road and Yongle East Road90 s
Intersection of Tangnan Road and Yongle East Road110 s
Intersection of Xingyuan Middle Road and Yongle East Road60 s