Research Article
Automated Container Terminal Production Operation and Optimization via an AdaBoost-Based Digital Twin Framework
Table 1
Parameter setting for the operation of ACT.
| Configurations | Detailed information |
| Ship demand | Planned berthing ship | Changjiang 002, length of 258 meters | Planned berthing time | 7:00 a.m. on 19. Oct. | Operation test time | 9:00 a.m. to 4:00 p.m. | Plan berthing location | 4–6 container regions corresponding to the shoreline position | Estimated time of departure | 6:00 p.m. on December 19 | Berthing way | Berthing on starboard side | AQC | Number of AQC | 4 AQCs were used | AGV | Number of AGV | 10 AGVs were used | AYC | Number of AYC | 6 AYCs were used | Container | Number of containers | 20 feet, the quantity varies from 20 to 200 | Container region | Use of container region | Container regions 3–6 are used |
|
|