Research Article
A MultiObjective Optimization Approach for Integrated Timetabling and Vehicle Scheduling with Uncertainty
Table 2
Subscripts and parameters of the problem formulation.
| Notations | Definition |
| S | Number of stops | N | Number of trips | F | Number of time periods | ts,n | Arrival time of the trip n on stop s | fsb (t) | Passenger boarding flow distribution function | fso (t) | Passenger alighting flow distribution function | Qsb | Expectation of total passenger boarding flow | Qso | Expectation of total passenger alighting flow | Cveh | Vehicle available cost | Cij | Link cost of arc (i, j) | Pij | Penalty of the infeasible time of arc (i, j) | Tf | Trip time in period f | hfmin | Lower bound of the headway at period f | hfmax | Upper bound of the headway at period f | Cmax | Maximum capacity of the bus vehicles |
|
|