Research Article
A MultiObjective Optimization Approach for Integrated Timetabling and Vehicle Scheduling with Uncertainty
Table 3
Sets and variables of the problem formulation.
| Notations | Definition |
| | Set of pull-out arcs | Q | Set of pull-in arcs | R | Set of the trip-link arcs | A | Set of all arcs, A = P∪Q∪R | D | Set of depots | T | Set of trips | hf | Headway during the period f | xij | 1 if arc (i, j) is selected; 0 otherwise |
|
|