Research Article

A MultiObjective Optimization Approach for Integrated Timetabling and Vehicle Scheduling with Uncertainty

Table 3

Sets and variables of the problem formulation.

NotationsDefinition

Set of pull-out arcs
QSet of pull-in arcs
RSet of the trip-link arcs
ASet of all arcs, A = PQR
DSet of depots
TSet of trips
hfHeadway during the period f
xij1 if arc (i, j) is selected; 0 otherwise