Research Article
A MultiObjective Optimization Approach for Integrated Timetabling and Vehicle Scheduling with Uncertainty
Table 7
Results of the different schedules.
| | Fleet size | Passenger travel cost | Incompatible trip-link cost | Vehicle scheduling cost |
| Pareto optimal solution | 20–23 | 1.2 × 106∼1.4 × 106 | 0–1.2 × 106 | 3.6 × 106∼7.8 × 106 | Recursive approach schedule | 23 | 1.3 × 106 | 1.5 × 106 | 6.3 × 106 | Current implementation schedule | 23 | 1.3 × 106 | 1.2 × 106 | 8.7 × 106 |
|
|