Research Article
Profit Maximization Model with Fare Structures and Subsidy Constraints for Urban Rail Transit
| Optimized solution | FF | DBF |
| Fare (¥) | 4.88 | | Headway (min) | 8.56 | 9.82 | Revenue (¥/h) | 283754.21 | 245907.52 | Operating costs (¥/h) | 214949.64 | 218266.28 | Operator profit (¥/h) | 68804.57 | 27641.24 | Passenger surplus (¥/h) | 146131.37 | 225264.98 | Total social welfare (¥/h) | 214935.94 | 252906.22 | Subsidy (¥/h) | 0 | 0 | Demand (pass./h) | 57967 | 70989 |
|
|