Research Article

Profit Maximization Model with Fare Structures and Subsidy Constraints for Urban Rail Transit

Table 3

Optimized solution.

Optimized solutionFFDBF

Fare (¥)4.88
Headway (min)8.569.82
Revenue (¥/h)283754.21245907.52
Operating costs (¥/h)214949.64218266.28
Operator profit (¥/h)68804.5727641.24
Passenger surplus (¥/h)146131.37225264.98
Total social welfare (¥/h)214935.94252906.22
Subsidy (¥/h)00
Demand (pass./h)5796770989