Research Article

Simultaneous Optimization of Train Timetabling and Platforming Problems for High-Speed Multiline Railway Network

Table 6

Performance comparison with an increase in the number of train paths.

ScenarioLength of start time window (min)Length of station dwell time window (min)ObjectiveCPU time (s)

2-124902.845.3
2-25760.3116.4
2-310692.2177.7
2-415691.3379.7
2-520691.1820.6
2-625691.11041.6
2-742902.617.4
2-85775.3285.4
2-910708.6231.6
2-1015703.5402.1
2-1120703.51566