Research Article

Simultaneous Optimization of Train Timetabling and Platforming Problems for High-Speed Multiline Railway Network

Table 9

Performance comparison with an increase in the number of trains for medium-sized cases.

Number of trainsUpper boundLower boundGAP (%)CPU time (s)

1-15700691.11.283600
1-20959.5951.70.813600
1-2512071186.41.173600
1-301598.71513.65.323600
1-352040.41837.69.943600
1-402424.82203.69.123600
1-482983.62622.512.063600