Research Article
Simultaneous Optimization of Train Timetabling and Platforming Problems for High-Speed Multiline Railway Network
Table 9
Performance comparison with an increase in the number of trains for medium-sized cases.
| Number of trains | Upper bound | Lower bound | GAP (%) | CPU time (s) |
| 1-15 | 700 | 691.1 | 1.28 | 3600 | 1-20 | 959.5 | 951.7 | 0.81 | 3600 | 1-25 | 1207 | 1186.4 | 1.17 | 3600 | 1-30 | 1598.7 | 1513.6 | 5.32 | 3600 | 1-35 | 2040.4 | 1837.6 | 9.94 | 3600 | 1-40 | 2424.8 | 2203.6 | 9.12 | 3600 | 1-48 | 2983.6 | 2622.5 | 12.06 | 3600 |
|
|