Research Article

Static Integration Based on Stochastic P-Time Petri Nets of Maintenance Scheduling for Railway Transport Equipment

Table 1

Formulation of problem.

Number of EMU (M) in railway transport network
Number of travel operation of total weekly travel operation
Starting time of travel operation of weekly travel operation
Maintenance time allocated to a transport equipment (EMU) M in transport network
Age of EMU in transport network
Index of travel, , where m is the number of weekly travel operations
Ending time of travel operation of weekly travel operation
Maximum EMU age