Research Article
Graphical Optimization Method for Symmetrical Bidirectional Corridor Progression
Table 1
The optional vehicle speed set during the first rotation transformation in the second round.
| Bottleneck points | The start point/endpoint of the coordinated phase | Adjusted speed (m/s) | Optional vehicle speed SV1 |
| PE7 | (2010, 268) | PF1 | (0, 102) | VF1 = 12.11 | VF1 SV1 | PF2 | (350, 144) | VF2 = 13.39 | VF2 SV1 | PF3 | (750, 186) | VF3 = 15.37 | VF3 SV1 | PF4 | (910, 186) | VF4 = 13.41 | VF4 SV1 | PF5 | (1450, 224) | VF5 = 12.73 | VF5 SV1 | PF6 | (1730, 266) | VF6 = 140.00 | VF6 SV1 |
| PB3 | (750, 134) | PS4 | (910, 134) | VS4 = | VS4 SV1 | PS5 | (1450, 176) | VS5 = 16.67 | VS5 SV1 | PS6 | (1730, 214) | VS6 = 12.25 | VS6 SV1 | PS7 | (2010, 212) | VS7 = 16.15 | VS7 SV1 | PS8 | (2280, 260) | VS8 = 12.14 | VS8 SV1 |
|
|