Research Article

Study on the Operation Efficiency of Toll Roads in China from the Perspective of Scale Economy

Table 4

Parameter estimation results.

(I)(II)(III)(IV)(V)(VI)
Pooled OLSPanel GMM

Toll6.6780.8886.8515.7251.8586.591
(3.92)(1.28)(3.04)(2.79)(1.95)(3.78)
Urban−0.0138−0.000636−0.00912−0.00724−0.00414−0.0118
(−3.01)(−0.42)(−2.13)(−1.91)(−2.83)(−2.38)
Unemploy−0.144−0.0368−0.00992−0.239−0.0483−0.0401
(−2.39)(−2.15)(−0.17)(−3.77)(−4.19)(−0.61)
Eply0.1920.03780.1440.1510.03080.159
(3.77)(1.76)(2.37)(3.47)(1.66)(4.09)
Toll_Station−1.6420.618−1.407−2.8870.442−2.009
(−4.02)(4.76)(−4.08)(−2.68)(0.68)(−2.05)
Ltc0.1610.117−0.007650.2070.116−0.00746
(4.76)(6.71)(−0.27)(6.03)(8.68)(−0.34)
Ave_Salary0.203−0.05340.6680.518−0.2140.940
(0.77)(−0.34)(2.22)(1.32)(−2.41)(2.18)
_cons0.3720.2450.459−0.1770.6600.376
(0.56)(0.89)(0.78)(−0.21)(3.75)(0.55)
Hansen111
AR0.1260.1310.797
N174174174145145145

Note.Statistical significance at the 10% level; statistical significance at the 5% level; statistical significance at the 1% level. The t-statistics calculated with the standard error of heteroscedasticity are reported in brackets.