Research Article

Study on the Operation Efficiency of Toll Roads in China from the Perspective of Scale Economy

Table 7

Parameter estimation results.

(I)(II)(III)(IV)(V)(VI)
Pooled OLSPanel GMMPanel GMM

Toll8.3003.1059.0386.965
(3.60)(3.17)(2.50)(3.27)
Exp_per_land2.67411.86
(1.82)(3.14)
Toll_int−7.471−2.806−8.325−8.847−5.895−9.682
(−1.97)(−1.65)(−2.07)(−1.87)(−1.77)(−2.44)
Urban−0.0124−0.00278−0.0276−0.004690.00141−0.0467
(−2.58)(−1.91)(−1.91)(−2.95)(0.63)(−2.94)
Eply0.2550.05360.2420.06210.04870.157
(5.62)(2.69)(3.93)(2.52)(2.71)(3.05)
Toll_Station−1.5830.659−2.0670.7840.000752−0.000854
(−3.53)(4.14)(−3.20)(4.59)(3.57)(−1.27)
Ltc0.1080.01680.0482−0.01340.0602−0.0450
(2.35)(1.00)(0.44)(−0.82)(3.29)(−0.48)
Ave_Salary−0.112−0.230−0.761−0.230−0.165−1.425
(−0.31)(−2.04)(−1.16)(−1.32)(−1.04)(−1.80)
Hansen110.9991
AR0.1130.4050.2050.274
N174174145145145145

Note.Statistical significance at the 10% level; statistical significance at the 5% level; statistical significance at the 1% level. The t-statistics calculated with the standard error of heteroscedasticity are reported in brackets.