Research Article

Study on the Operation Efficiency of Toll Roads in China from the Perspective of Scale Economy

Table 9

Parameter estimation results.

(I)(II)
l_Debtl_Debt

Tollway_Mile_−7.009−9.008
(−3.53)(−5.81)
Toll_int16.259
(1.97)
Toll_int214.00
(3.40)
Ratio_GDP−0.165−0.111
(−6.27)(−3.51)
l_cost_manage1.4731.278
(13.41)(7.79)
l_cost_maintain0.1150.0855
(1.89)(1.07)
Toll_Station_1−8.027−5.748
(−3.72)(−6.48)
_cons3.8704.305
(25.66)(15.34)
AR test0.3020.365
Hansen test0.9841
N145145

Note.Statistical significance at the 10% level; statistical significance at the 5% level; statistical significance at the 1% level. The t-statistics calculated with the standard error of heteroscedasticity are reported in brackets.