Research Article

The Use of Road Microsimulation Software within BIM Environments: A Preliminary Assessment

Table 6

Global statistical tests in the case of the BPR cost function.

 F-test
F valueThresholdConfidence level (%)

Integrated solution0.4730.43518.5799.15999.90
Interfaceable solution0.6940.64436.92221.13799.90