Research Article

Adaptive Coordinated Variable Speed Limit between Highway Mainline and On-Ramp with Deep Reinforcement Learning

Table 1

ACVSL notation list.

No.NotationExplanation

1Section count on highway part , where and refers to mainline and on-ramp, respectively.
2Total flow through the merging bottleneck at time
3Traffic flow of section at time
4Error state of section on highway upstream of the merging zone at time
5Actual traffic density on section of highway at time
6Critical density between fluent and congested traffic flow
7Error state of merging zone at time step
8Actual density of merging zone at time step
9Control parameter on section of highway at time step
10Intended speed on VSL sign for section on highway at time step
11Length of section on highway
12Actual speed on section at time step
13Theoretical speed of the merging zone from macroscopic fundamental diagram at critical density
14Maximum speed limit demonstrated on VSL sign for section of at time step
15Actual speed on section of highway at time step
16Maximum speed difference in VSL between successive time steps and sections
17Final speed delivered to VSL sign after considering the lower bound of speed limit for section on highway at time step
18Upper bound of VSL
19Lower bound of VSL