Research Article

Impact of Change of the Interlocking on the Acceleration of Railway Transport: A Case Study from the Podbrezová Railway Station

Table 10

Calculation of station component tst2.

Serial numberOperationImplementingDuration

1.Offer and acceptance for the second trainStation inspectors both railway stations0, 25 min
2.Built of the train path for the 2nd departing train (including lighting of the leave signal at the signal allowing running)Station inspector0, 35 min
3.Walking to the train and train dispatchStation inspector, trainmaster, and guard0, 30 min

Σ1, 30 min