Research Article
Impact of Change of the Interlocking on the Acceleration of Railway Transport: A Case Study from the Podbrezová Railway Station
Table 6
Calculation of station component tst1.
| Serial number | Operation | Implementing | Duration |
| 1. | Return to the railway office | Station inspector | 0, 20 min | 2. | Train end message | Switchman and station inspector | 0, 10 min | 3. | Cancellation of a train path after the first train | Switchman | 2, 05 min | 4. | The advice of train arrival | Station inspectors both railway station | 0, 20 min |
| Σ | 2, 55 min |
|
|