Research Article

Impact of Change of the Interlocking on the Acceleration of Railway Transport: A Case Study from the Podbrezová Railway Station

Table 7

Calculation of station component tst2.

Serial numberOperationImplementingDuration

1.Offer and acceptance for the second trainStation inspectors both railway stations0, 25 min
2.Order for the construction of the departing train path for the second trainSwitchman and station inspector0, 20 min
3.Adjustment of points (moving parts of the switch) for the departure of the second trainSwitchman73, 50 min
4.Walking to the train and train dispatchStation inspector, train master, and guard0, 30 min

Σ5, 05 min