|
Parameter | Description | Value |
|
| The number of lines | 2 |
| The number of stations in each direction | 22 (line 1, line 2), 44 (total) |
| The number of transfer stations in each direction | 1 (line 1, line 2), 2 (total) |
| The minimum number of trains | 153 (line 1), 136 (line 2), 289 (total) |
| The maximum number of trains | 180 (line 1), 160 (line 2), 340 (total) |
| The start time of the time period | 1 (line 1, line 2) |
| The end time of the time period | 2100 (line 1, line 2) |
| The capacity of each train | 2016 (line 1, line 2) |
| The minimum headway of each train (min) | 4 (line 1, line 2) |
| The maximum headway of each train (min) | 10 (line 1, line 2) |
| The essential cycle time of each connection (min) | 112 (line 1), 111 (line 2) |
| The length of each time slice (min) | 0.5 |
| The unit operation cost of each train (CNY) | 852 (line 1), 834 (line 2) |
| The unit depreciation cost of each rolling stock (CNY) | 3696 (line 1, line 2) |
| The unit penalty time of each finally stranded passenger (min) | 1000 |
|