|
| Descriptions |
|
Variables |
| The predicted number of passengers waiting on the platform during the mth time interval |
| The predicted number of passengers on the trains passing through section l during the nth control time interval |
| The number of passengers entering station i during the nth control time interval with control |
| The number of passengers who need to enter station i during the nth control time interval |
| The number of passengers boarding the train at station i during the nth control time interval |
| The number of passengers getting off at station i during the nth control time interval |
| Remaining capacity of all trains arriving at station i during the nth control time interval |
| The number of passengers waiting on the platform during the nth control time interval |
| The number of passengers on the trains passing through section l during the nth control time interval |
| Control rate, generally in 0–50% |
|
Parameters |
T | The number of control time intervals |
| Length of each control time interval |
m | The timestamp index within the prediction time period |
M | The number of timestamps within the prediction time period |
n | The timestamp index within the control time period |
N | The number of timestamps within the control time period |
I | The number of stations |
i | The station index |
L | The number of sections |
l | The section index, section l is the segment between station i and i + 1 |
| The number of passengers entering the station during the mth time interval |
| The number of passengers getting off at station i during the mth time interval |
| The number of trains passing through section l during the mth time interval |
| The capacity of section l during the mth time interval |
| Effective area of the platform in station i |
| Maximum passenger density on platforms, generally 2–3 persons/ |
| The platform capacity of station i |
C | The standard capacity of a metro vehicle, i.e., the standard number of passengers that can be carried by a metro vehicle |
| Load factor |
| The maximum value of load factor, generally 130% |
| The number of trains passing through section l during the nth time interval |
| The capacity of section l during the nth control time interval |
| The number of passengers arriving at station i during the nth control time interval |
| The maximum control rate of station i |
| The percentage of passengers among the boarding passengers at station j, whose destination station is the ith station |
|