Optimization of Bus Rerouting to Alleviate the Impact of Rail Transit Construction

Table 7

The relation between the adjustment pattern and the value of .

0.150.160.170.180.190.20.210.220.230.240.250.260.270.280.290.3

Line 3 (min)13.4113.9314.4514.9715.4916.0116.5317.0517.57No need for adjustment
Adjustment patternMigration
Fleet size12131313131313131313131313131313

Line 106 (min)18.8919.3719.8520.3320.8121.2921.7722.2522.7323.2123.6924.1724.65No need for adjustment
Adjustment patternMigration
Fleet size12121212121212121212121313131313

Line 112 (min)22.9823.5824.1824.7825.3825.9826.5827.1827.7828.38No need for adjustment
Adjustment patternStop-skipping
Fleet size14141515151515151515151515151515

Line 116 (min)24.6725.1325.5926.0526.5126.9727.4327.8928.3528.8129.2729.7330.1930.6531.1131.57
Adjustment patternMigrationStop-skipping
Fleet size11111111111212121212121212121212

Before rail construction, the fleet size for the operation of lines 3, 106, 112, 116, is, respectively 12, 10, 12, and 10; during rail construction, if they maintain operation without adjustment, the fleet size will increase to 14, 14, 16, and 12, respectively.