Research Article
Lane-Level Road Map Construction considering Vehicle Lane-Changing Behavior
Figure 12
Fitting results of trajectory distribution on road cross-section based on WCGMM: (a) condition of one lane, (b) condition of two lanes, (c) condition of three lanes, (d) condition of four lanes, (e) condition of five lanes, and (f) condition of six lanes.
| (a) |
| (b) |
| (c) |
| (d) |
| (e) |
| (f) |