Research Article

Synergistic Optimization Method for URT Network Train Connection Scheme in Peak and Off-Peak Periods

Table 4

Setting model parameters.

VariableDefinitionLine Value

Rated capacity of each train of line 1942
21187
31436
41504
Departure interval in the direction d of line (off-peak period)1360 s
2405 s
3420 s
4405 s
4-branch line415 s
Departure interval in the direction d of line (peak period)1140 s
2220 s
3350 s
4285 s
4-branch line415 s
480 s
120 s
Dwell time for the direction of line at station 1, 2, 3, 440 s
Running time for the direction of line from the departure station to station According to the actual performance timetable data
Maximum load factor of the train1, 2, 3, 4100%
Passenger capacity limit of the platform1, 2, 3, 41000