Simulation scenarios.

ScenarioInfrastructureNumber of trains (full length of the line/C-D/E-F)Train fleeting in line sectionsRole in the study

Sc01I1—trains are organized between stations14/14/18NoneBasic (input) state
Sc02I2 at sections C-D13/15/18C-DRole of automatic block (I2)
Sc03I2 at sections A-B, E-F14/14/22A-B, E-F
Sc04I3 at sections C-D13/15/18C-DRole of automatic line block (I3)
Sc0514/22/14NoneRole of I3 without fleeting
Sc0614/22/14C-DRole of I3 with fleeting
Sc07I3 at C-D, E-F14/22/22NoneI3 extended to two sections
Sc08I5 C-D double track (operated by I2)14/22/14C-DMiddle section C-D double track (I5)
Sc07-1I3 at C-D, E-F14/22/22NoneI3 at 2 sections together with increased mean value of delay