Research Article

Assessing the Dynamic Resilience of Local Roads: A Case Study of Flooding in Wuhan, China

Table 1

Categorization and description of the recovery processes of four selected local roads under different traffic operating conditions during the extended morning peak period.

Recovery processIndicatorsLocal road 1Local road 2Local road 3Local road 4
Smooth traffic operating conditionCongested traffic operating conditionSeverely congested traffic operating conditionSmooth traffic operating conditionCongested traffic operating conditionSeverely congested traffic operating conditionSmooth traffic operating conditionCongested traffic operating conditionSeverely congested traffic operating conditionSmooth traffic operating conditionCongested traffic operating conditionSeverely congested traffic operating condition

1Time span (A.M.)07:50–08:1007:50–08:0007:10–07:3007:00–07:1007:00–07:1008:10–08:3007:30–08:0007:20–07:5007:30–08:2007:40–09:2007:30–08:1007:50–08:20
MaxRL0.0340.0280.0130.0180.0180.0140.0750.0520.0500.0670.1020.021
Rapidity (hours)0.3330.1670.3330.1670.1670.3330.5000.5000.8331.6670.6670.500

2Time span (A.M.)08:10–08:4008:20–09:1007:40–08:3007:30–08:4007:30–08:4008:40–08:5008:20–08:4008:20–08:4008:20–09:3008:40–09:20
MaxRL0.0360.0920.0660.0490.0720.0200.1150.1040.1090.039
Rapidity (hours)0.5000.8330.8331.1671.1670.1670.3330.3331.1670.667

3Time span (A.M.)09:20–09:5008:50–09:0009:00–09:1009:50–10:00
MaxRL0.0420.0600.0180.025
Rapidity (hours)0.5000.1670.1670.167

4Time span (A.M.)09:50–10:0009:20–09:30
MaxRL0.0700.027
Rapidity (hours)0.1670.167