Research Article
Optimizing Joint Decisions of Dynamic Pricing and Ticket Allocation for High-Speed Railway with Operators’ Risk Preference
Table 2
Utility parameter
, , , average demand
, and variance of demand
.
| OD | (yuan)/ (minute) | | | (yuan) | Train A | Train B | Train C | Train D |
| 1 | 0/0 | 0/0 | 31.6/73 | 32.8/75 | 455 | 42 | 144.5 | 2 | 37/82 | 40.4/106 | 0/0 | 40.9/101 | 249.7 | 44.1 | 184.5 | 3 | 0/0 | 0/0 | 62.9/159 | 62.9/153 | 241.9 | 46.3 | 284 | 4 | 0/0 | 67.7/171 | 0/0 | 68.5/173 | 387.2 | 48.6 | 309 | 5 | 0/0 | 0/0 | 98.3/256 | 98.3/250 | 175.5 | 51.1 | 443.5 | 6 | 0/0 | 114.7/312 | 0/0 | 116/312 | 368 | 53.6 | 523.5 | 7 | 110.6/268 | 121.2/346 | 122.5/342 | 122.5/342 | 411.5 | 56.3 | 553 | 8 | 0/0 | 0/0 | 0/0 | 8.9/26 | 168.6 | 42 | 40 | 9 | 0/0 | 0/0 | 30.9/86 | 30.9/78 | 282 | 44.1 | 139.5 | 10 | 0/0 | 0/0 | 0/0 | 36.4/98 | 162.7 | 46.3 | 164.5 | 11 | 0/0 | 0/0 | 66.2/183 | 66.2/175 | 199.8 | 48.6 | 299 | 12 | 0/0 | 0/0 | 0/0 | 84/237 | 144 | 51.1 | 379 | 13 | 0/0 | 0/0 | 90.5/269 | 90.5/267 | 297.5 | 53.6 | 408.5 | 14 | 0/0 | 0/0 | 0/0 | 22/52 | 181.4 | 42 | 99.5 | 15 | 0/0 | 27.3/65 | 0/0 | 27.6/72 | 208.4 | 44.1 | 124.5 | 16 | 0/0 | 0/0 | 0/0 | 57.4/149 | 159.7 | 46.3 | 259 | 17 | 0/0 | 74.3/206 | 0/0 | 75.1/211 | 202.6 | 48.6 | 339 | 18 | 73.7/186 | 80.8/240 | 0/0 | 81.6/189 | 172.2 | 51.1 | 368.5 | 19 | 0/0 | 0/0 | 0/0 | 5.5/20 | 254 | 42 | 25 | 20 | 0/0 | 0/0 | 35.3/97 | 35/97 | 181.6 | 44.1 | 159.5 | 21 | 0/0 | 0/0 | 0/0 | 52.5/159 | 299.5 | 46.3 | 239.5 | 22 | 0/0 | 0/0 | 59.6/183 | 59.6/189 | 406.3 | 48.6 | 269 | 23 | 0/0 | 0/0 | 0/0 | 29.5/77 | 455 | 42 | 134.5 | 24 | 0/0 | 42.9/141 | 0/0 | 47/139 | 249.7 | 44.1 | 214.5 | 25 | 0/0 | 48.8/175 | 0/0 | 53.5/169 | 241.9 | 46.3 | 244 | 26 | 0/0 | 0/0 | 0/0 | 17.5/62 | 387.2 | 42 | 80 | 27 | 0/0 | 0/0 | 24/86 | 24/92 | 175.5 | 44.1 | 109.5 | 28 | 0/0 | 5.9/34 | 0/0 | 6.5/30 | 368 | 42 | 29.5 |
|
|