Research Article

Optimizing Joint Decisions of Dynamic Pricing and Ticket Allocation for High-Speed Railway with Operators’ Risk Preference

Table 2

Utility parameter , , , average demand , and variance of demand .

OD (yuan)/ (minute) (yuan)
Train ATrain BTrain CTrain D

10/00/031.6/7332.8/7545542144.5
237/8240.4/1060/040.9/101249.744.1184.5
30/00/062.9/15962.9/153241.946.3284
40/067.7/1710/068.5/173387.248.6309
50/00/098.3/25698.3/250175.551.1443.5
60/0114.7/3120/0116/31236853.6523.5
7110.6/268121.2/346122.5/342122.5/342411.556.3553
80/00/00/08.9/26168.64240
90/00/030.9/8630.9/7828244.1139.5
100/00/00/036.4/98162.746.3164.5
110/00/066.2/18366.2/175199.848.6299
120/00/00/084/23714451.1379
130/00/090.5/26990.5/267297.553.6408.5
140/00/00/022/52181.44299.5
150/027.3/650/027.6/72208.444.1124.5
160/00/00/057.4/149159.746.3259
170/074.3/2060/075.1/211202.648.6339
1873.7/18680.8/2400/081.6/189172.251.1368.5
190/00/00/05.5/202544225
200/00/035.3/9735/97181.644.1159.5
210/00/00/052.5/159299.546.3239.5
220/00/059.6/18359.6/189406.348.6269
230/00/00/029.5/7745542134.5
240/042.9/1410/047/139249.744.1214.5
250/048.8/1750/053.5/169241.946.3244
260/00/00/017.5/62387.24280
270/00/024/8624/92175.544.1109.5
280/05.9/340/06.5/303684229.5