Research Article
Identification of Working Trucks and Critical Path Nodes for Construction Waste Transportation Based on Electric Waybills: A Case Study of Shenzhen, China
Figure 5
Thermal map of the spatial distribution of the operation trajectory of the garbage trucks in each period. (a) 13:00-14:00. (b) 14:00-15:00. (c) 15:00-16:00. (d) 20:00-21:00. (e) 21:00-22:00. (f) 22:00-23:00.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |