|
Notation | Definition |
|
N | The set of serial numbers of all demand points, N = {0, 1, ..., n}, where 0 denotes the distribution center and the rest nodes denote demand points |
S | The set of originating nodes |
E | The set of final arrival nodes |
SC | The set of originating nodes and demand nodes |
DE | The set of demand nodes and final arrival nodes |
B | An infinite number |
K | The set of all vehicles, K = {l, 2, ..., n} |
F | Denotes the fixed cost of dispatching a vehicle |
Cij | The unit transportation rate from point i to point j |
qi | The quantity demanded at demand point i |
Q | Maximum load capacity of a dispatching vehicle |
[ET, LT] | The left and right time windows of the distribution center |
[ai, bi] | Left and right time windows for demand point i |
Dij | Distance from demand point i to distribution center j |
Wik | Time when vehicle k arrives at demand point i |
Si | Service time of demand point i |
Tijk | Travel time of vehicle k from demand point i to demand point j |
ϒ | Price per unit of carbon emissions |
Yik | 0-1 variable, yik = 1 when the kth vehicle is in service, otherwise yik = 0 |
P | Overload penalty factor |
R | Overtime penalty factor |
SD | Any subset of the set of demand points |
|SD| | Number of demand points in the set S |
Xijk | 0-1 variable, xijk = 1 when the kth vehicle passes from point i to point j, otherwise xijk = 0 |
|