Research Article

Ecological and Real-Time Route Selection Method for Multiple Vehicles in Urban Road Network

Table 4

Traffic utilization of road section.

RoadsTraffic utilization of road section
VGAHABCMPSORSGEMR2SM

1-20.560.590.620.590.66
1–30.80.690.750.740.77
2–60.750.760.780.790.81
3-40.680.720.650.690.73
3–100.840.720.780.860.79
4-50.790.750.650.770.77
4–110.850.830.820.850.87
5-60.890.940.950.790.75
5–71.221.211.21.171.12
6–80.790.760.80.840.81
7-80.750.770.860.810.83
7–121.21.181.161.141.13
8-90.410.470.50.570.59
8–130.80.80.760.870.86
9–140.50.490.50.560.54
10-111.121.160.981.030.96
11-121.181.191.161.051.09
11–160.860.870.850.940.92
12-131.061.041.110.930.95
12–150.490.570.580.510.59
12–171.171.161.181.071.09
13-141.091.131.161.091.04
13–150.810.790.810.870.84
15–180.550.590.630.620.66
16-170.440.40.360.420.39
17-180.360.380.370.390.40
Average0.8060.8060.8070.8060.806
Variance0.0680.0650.0630.0470.042