Research Article
Design of a High-Speed Railway Passenger Train Operation Scheme considering Survivability of the Network
Table 3
Top ten key nodes and key edges.
| Key node quantization | Key edge quantization | Stations | Rank | Comprehensive evaluation index | Edges (a pair of stations) | Rank | Key edge quantification index |
| Zhengzhoudong | 1 | 4.8310 | Zhengzhou | Zhengzhoudong | 1 | 23.5050 | Wuhan | 2 | 4.2503 | Wuhan | Hankou | 2 | 17.2041 | Chongqingbei | 3 | 4.2497 | Guiyangbei | Guiyangdong | 3 | 14.7036 | Nanjingnan | 4 | 3.6255 | Chongqingbei | Bishan | 4 | 13.7583 | Zhengzhou | 5 | 3.6251 | Xu Changdong | Zhengzhoudong | 5 | 11.8231 | Guiyangdong | 6 | 3.6236 | Xinxiangdong | Zhengzhoudong | 6 | 11.8213 | Hangzhoudong | 7 | 3.6225 | Zhengzhoudong | Zhengzhoudong | 7 | 11.8170 | Xuzhoudong | 8 | 3.0433 | Wuhan | Hong’anxi | 8 | 10.3794 | Xi’anbei | 9 | 3.0407 | Chongqingbei | Guangannan | 9 | 10.3674 | Hankou | 10 | 3.0407 | Chongqingbei | Chongqingxi | 10 | 10.3625 |
|
|