Research Article

Collaborative Optimization Model for the Design and Operation of Feeder Bus Routes Based on Urban Metro

Table 2

Length of paths between bus demand stops (unit: km).

Bus demand stop567891011121314151617181920

50.6430.9391.4620.4100.3850.3860.7330.5810.8231.2531.5691.0331.1921.4811.464
60.6430.3040.8370.9710.9420.3371.1150.5570.6530.8581.2081.3021.3231.3631.499
70.9390.3040.5331.2751.2070.5921.3160.7080.6980.7121.0491.4471.4091.3271.528
81.4620.8370.5331.8081.6931.0941.7241.1170.9990.7130.9251.7781.6611.3981.686
90.4100.9711.2751.8080.5890.7830.9960.9901.2331.6601.9791.3231.5281.8711.819
100.3850.9421.2071.6930.5890.6160.4070.6230.8471.3221.5880.7350.9551.3591.255
110.3860.3370.5921.0940.7830.6160.7850.3050.5050.8831.2140.9991.0641.2191.284
120.7331.1151.3161.7240.9960.4070.7850.6140.7471.2011.3950.3290.5751.0490.882
130.5810.5570.7081.1170.9900.6230.3050.6140.2440.7050.9980.7500.7720.9240.980
140.8230.6530.6980.9991.2330.8470.5050.7470.2440.4770.7540.7820.7110.7240.849
151.2530.8580.7120.7131.6601.3220.8831.2010.7050.4770.3501.1580.9870.6870.976
161.5691.2081.0490.9251.9791.5881.2141.3950.9980.7540.3501.2721.0380.5730.920
171.0331.3021.4471.7781.3230.7350.9990.3290.7500.7821.1581.2720.2880.8240.588
181.1921.3231.4091.6611.5280.9551.0640.5750.7720.7110.9871.0380.2880.5450.308
191.4811.3631.3271.3981.8711.3591.2191.0490.9240.7240.6870.5730.8240.5450.351
201.4641.4991.5281.6861.8191.2551.2840.8820.9800.8490.9760.9200.5880.3080.351