Research Article
An Improved Adaptive Simulated Annealing Particle Swarm Optimization Algorithm for ARAIM Availability
Table 2
ICAO navigation performance requirements for each approach phase.
| Phase | Precision (95%) | Alarm limit | Continuity | Availability |
| NPA | 220 m (H) | 550 m (H) | 1 × 10–4/h | 0.99 | N/A (V) | N/A (V) | 1 × 10–8/h | 0.99999 |
| APV-I | 16 m (H) | 40 m (H) | 8 × 10–6/15 s | 0.99 | 20 m (V) | 50 m (V) | 0.9999 |
| APV-II | 16 m (H) | 40 m (H) | 8 × 10–6/15 s | 0.99 | 8 m (V) | 20 m (V) | 0.99999 |
| LPV-200 | 16 m (H) | 40 m (H) | 8 × 10–6/15 s | 0.99 | 4 m (V) | 35 m (V) | 0.99999 |
| CAT-I | 16 m (H) | 40 m (H) | 8 × 10–6/15 s | 0.99 | 4∼6 m (V) | 10 m (V) | 0.99999 |
|
|