Research Article

Statistical Analysis of Train Operation and Passenger Distribution Based on Real Records: A Case Study of Wuhan-Guangzhou HSR

Figure 8

Capacity utilization of WG-HSR during various time periods. (a) Date: 2015/03/24–2015/06/30. (b) Date: 2015/07/01–2016/01/09. (c) Date: 2016/01/10–2016/05/14. (d) Date: 2016/05/15–2016/11/10.
(a)
(b)
(c)
(d)