Research Article
An Optimization Strategy for Truncating Ultralong Bus Lines Integrated with Metro Networks
| Parameters | Data |
| Maximum section passenger flow per hour | 412 person/h | Total passenger flow | 21011 persons | Line length | 22 km | Number of stops | Up: 27 stops, down: 28 stops | Value of time | 34.5 CNY/h | The vehicle cost of a small bus | 205.48 CNY/(vehicle·day) | The operating cost of a small bus | 3 CNY/km | Maximum capacity of a small bus | 60 people | The vehicle cost of a large bus | 410.96 CNY/(vehicle·day) | The operating cost of a large bus | 5 CNY/km | Maximum capacity of a large bus | 120 people |
|
|