Research Article

An Optimization Strategy for Truncating Ultralong Bus Lines Integrated with Metro Networks

Table 3

Parameters of #52.

ParametersData

Maximum section passenger flow per hour412 person/h
Total passenger flow21011 persons
Line length22 km
Number of stopsUp: 27 stops, down: 28 stops
Value of time34.5 CNY/h
The vehicle cost of a small bus205.48 CNY/(vehicle·day)
The operating cost of a small bus3 CNY/km
Maximum capacity of a small bus60 people
The vehicle cost of a large bus410.96 CNY/(vehicle·day)
The operating cost of a large bus5 CNY/km
Maximum capacity of a large bus120 people