Research Article
An Optimization Strategy for Truncating Ultralong Bus Lines Integrated with Metro Networks
| Line | Length (km) | Headway (min) | Fleet size |
| First part line (S1–S15) | 11.5 | 11 | 8 large and 9 small buses | Second part line (S15–S28) | 10.5 | 11 | 1 large and 8 small buses |
|
|