Research Article
Mechanism Analysis of the Impact of COVID-19 on the Whole Process of Aircraft Turnaround Operations
Table 8
Statistical indexes of the duration time of subprocesses on critical path 3 before and after COVID-19.
| Indexes (min) | Before | After | Avg | Std dev | Max | Min | Avg | Std dev | Max | Min |
| Turnaround time | 67.1 | 9.35 | 48.8 | 84.9 | 74.8 | 7.88 | 87.2 | 64.3 | Baggage unloading | 6.9 | 2.95 | 14.3 | 3.4 | 7.4 | 4.21 | 18.2 | 4.1 | Cargo unloading | 18.7 | 8.40 | 37.3 | 4.4 | 27.9 | 13.41 | 48.1 | 10.6 | Cargo loading | 18.8 | 11.09 | 42.1 | 1.6 | 17.6 | 8.40 | 31.8 | 3.7 | Baggage loading | 10.5 | 8.74 | 43.6 | 4.3 | 9.7 | 5.62 | 22.6 | 2.9 |
|
|